Explore more publications!

1/12/26 – CONSTRUCTION BEGINS ON KAHULUI SMALL BOAT HARBOR BATHROOM AND WASTEWATER SYSTEM

JOSH GREEN, M.D.
GOVERNOR

RYAN KANAKAʻOLE
 ACTING CHAIRPERSON

CONSTRUCTION BEGINS ON KAHULUI SMALL BOAT HARBOR BATHROOM AND WASTEWATER SYSTEM

KAHULUI, Maui – Today marks the start of a long-awaited bathroom and wastewater system construction project at Kahului Small Boat Harbor on Maui.

The scope of work involves the installation of a prefabricated bathroom unit, water and electrical utilities, sidewalks and an individual wastewater system.

The project will cost $1,398,315 and has an estimated completion date of June 12, 2026.

No detrimental effects are anticipated at the Kahului Ramp and surrounding areas; however, there may be minor interruptions to traffic flow. Trailer parking will also be reduced temporarily during the construction period.

The contractor, Valley Isle Pumping, Inc., will work closely with harbor users and DLNR’s Division of Boating and Ocean Recreation (DOBOR) staff to ensure there are limited impacts.

# # #

RESOURCES

(All images/video Courtesy: DLNR)

 

Photographs: Kahului Small Boat Harbor Improvements (Jan. 2026):

https://www.dropbox.com/scl/fo/fmikzch85w9isyo1g7j6d/AFIb9IqLzIJOmtSYWGvRum8?rlkey=3xqdljerah3fdjca0h1ilyrgz&st=88cdzx4d&dl=0

 

 

Media Contact:

Ryan Aguilar

Communications Specialist

State of Hawaiʻi Department of Land and Natural Resources

E-mail: [email protected]

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share us

on your social networks:
AGPs

Get the latest news on this topic.

SIGN UP FOR FREE TODAY

No Thanks

By signing to this email alert, you
agree to our Terms & Conditions