AGP Picks
View all

AGFC Closing Gates at Lake Conway Dec. 2

News originally published by

Arkansas Game & Fish Commission

“Forage stockings have actually already begun with the addition of about 200,000 golden shiners to the lake last week,” Feltz said. “Now that the water is cooling down and we’re planning to let the lake fill, we’ve already started the ball rolling on shiners, and we plan to have fathead minnows, bluegill and redear stocked this winter. We typically wait 6 to 8 months before we stock gamefish to give the forage a head start, and if the forage base responds like we think it will, I’m really wanting to lean toward that 6-month window, but we’ll have to assess once the water is back in the lake.”

Feltz also highlighted some of the work at access points throughout the lake that will benefit shorebound anglers. In addition to improved parking areas and boat ramps being installed during the last few months at many of the public access points, several fishing piers and banks popular with anglers were deepened slightly to offer better angling close to the shore.

“We’ve heard a lot of people suggest that we dig out areas and make islands, but we simply can’t do that because it’s still a wetland area and we have to follow special federal regulations that protect wetlands from damage,” Feltz said. “But we’re doing what we can to improve those areas that we can within the parameters of our permitted activities.”

Feltz reminds anglers and landowners that there is still a good amount of construction work to be done at many access points, and boat lane marking will be completed once the water has filled in the lake and staff can launch barges to work on the water.

“We want to get a good idea about how everything looks from the surface of the water before we finalize how we’re marking the lanes,” Feltz said. “Large utility poles have been driven into the lakebed already, but we’re still deciding on how we label them once we see everything from a boat. There are about 50 or so poles left to drive, primarily south of Highway 89 and in Gold Creek west of I-40, and the contractor will return to complete that once the water has risen.”

 

####

 

CUTLINES: 

CONSTRUCTION
Construction at Lake Conway has progressed enough to close the gates of the auxiliary structure and allow water to refill the lake, beginning Dec. 2. AGFC photo.

AERIAL
The previous, worn-down manual dam and drain pipes have been completely replaced with a passive spillway and an auxiliary structure to perform future maintenance drawdowns when needed. AGFC photo.

BREAM IN NET
AGFC hatchery crews have already begun stocking Conway with baitfish and plan to stock bluegill and redear sunfish this winter to serve as both forage for larger species and some of the first gamefish the lake will see. AGFC photo.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

International Real Estate Daily

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.